Skip to content

Reference

Food Safety Inspection Router glossary

Terms used in Food Safety Inspection Router and its documentation.

Applies to Food Safety Inspection Router as it works today. Moraph updates the platform continuously, and this page is reviewed when it changes.

Last reviewed 2 min readReport a problem

Terms used in Food Safety Inspection Router and its documentation.

TermMeaning
Risk categoryHigh, Medium or Low, set by your staff for each facility. It decides how many days pass between routine inspections, and is one factor in the risk score.
Required frequencyA frequency in days set for a facility in law, regulation or agreement. Used instead of the risk category’s when it is shorter.
Due listActive facilities that are overdue or come due within the look-ahead, with any inspection already scheduled.
Day routeEach inspector’s inspections for a day in a suggested order, by straight-line distance from their start point.
Nearest neighbourA simple way to order stops: from where you are, go to the closest stop not yet visited, and repeat.
Re-inspectionAn inspection that follows up a failed one, scheduled automatically, which passes only once the original violations are corrected or withdrawn.
ViolationA finding on an inspection with its code reference and severity, open until corrected or withdrawn.
Enforcement actionA warning, notice, fine, suspension, closure order or referral, proposed by staff and issued by a product administrator.
Risk scoreThe sum of points for a facility’s risk factors (staff category, facility type, open violations, failed inspections, repeat violations, open signals, days overdue) with the weights in the approved risk model. Not a statistical prediction.
Risk bandHigh, Medium or Low from the risk score and the band thresholds in the risk model.
Back-testScoring each facility as of its most recent completed inspection, with only what was known before it, and counting fails in each band.
SignalA recall, complaint, laboratory result or outbreak notice about a facility, recorded by staff or sent through the Work API.
PlanInspections proposed for a territory and period, adjusted by the planner and approved by a supervisor who isn’t the planner.
Required visitAn inspection due under a facility’s own required frequency. Plans schedule required visits before any others.
Risk-driven visitAn inspection proposed for a facility in the High band that isn’t due yet, added only while inspectors have capacity.
Repeat violationA violation whose code reference was cited at the same facility within the repeat look-back.
Field sheetA printable list of an inspector’s visits for a day with facility history, open violations, signals and blank checklists, for use without a connection.
Inspection scoreA starting score less points for each violation by severity, with fewer points off when corrected on site, and a grade from the thresholds in Router settings. Used only when a product administrator switches scoring on.
Inspection reportA printable report of one inspection for the facility’s operator: result, score, each violation with its citation, severity, observation and correction status.
Operator linkA link, shown once and lasting a set number of days, that lets a facility’s operator read an inspection report without an account, acknowledge receipt and report violations as corrected for staff to verify.
Public resultsA public page, off until switched on, listing Active facilities with their completed inspections, results, citations and severity. It is not indexed by search engines.
Operating datesThe first and last day a seasonal or temporary facility trades. Outside them the facility is not due for inspection.

Was this page helpful?

Report a problem with this page
What’s the problem?
Quote the step or heading if you can. Don’t include passwords or personal records.
Only if you’d like a reply. We use it for this report and nothing else.

Need help with your own setup rather than this page? Raise a support ticket.