Reference
Food Safety Inspection Router glossary
Terms used in Food Safety Inspection Router and its documentation.
Applies to Food Safety Inspection Router as it works today. Moraph updates the platform continuously, and this page is reviewed when it changes.
Terms used in Food Safety Inspection Router and its documentation.
| Term | Meaning |
|---|---|
| Risk category | High, Medium or Low, set by your staff for each facility. It decides how many days pass between routine inspections, and is one factor in the risk score. |
| Required frequency | A frequency in days set for a facility in law, regulation or agreement. Used instead of the risk category’s when it is shorter. |
| Due list | Active facilities that are overdue or come due within the look-ahead, with any inspection already scheduled. |
| Day route | Each inspector’s inspections for a day in a suggested order, by straight-line distance from their start point. |
| Nearest neighbour | A simple way to order stops: from where you are, go to the closest stop not yet visited, and repeat. |
| Re-inspection | An inspection that follows up a failed one, scheduled automatically, which passes only once the original violations are corrected or withdrawn. |
| Violation | A finding on an inspection with its code reference and severity, open until corrected or withdrawn. |
| Enforcement action | A warning, notice, fine, suspension, closure order or referral, proposed by staff and issued by a product administrator. |
| Risk score | The sum of points for a facility’s risk factors (staff category, facility type, open violations, failed inspections, repeat violations, open signals, days overdue) with the weights in the approved risk model. Not a statistical prediction. |
| Risk band | High, Medium or Low from the risk score and the band thresholds in the risk model. |
| Back-test | Scoring each facility as of its most recent completed inspection, with only what was known before it, and counting fails in each band. |
| Signal | A recall, complaint, laboratory result or outbreak notice about a facility, recorded by staff or sent through the Work API. |
| Plan | Inspections proposed for a territory and period, adjusted by the planner and approved by a supervisor who isn’t the planner. |
| Required visit | An inspection due under a facility’s own required frequency. Plans schedule required visits before any others. |
| Risk-driven visit | An inspection proposed for a facility in the High band that isn’t due yet, added only while inspectors have capacity. |
| Repeat violation | A violation whose code reference was cited at the same facility within the repeat look-back. |
| Field sheet | A printable list of an inspector’s visits for a day with facility history, open violations, signals and blank checklists, for use without a connection. |
| Inspection score | A starting score less points for each violation by severity, with fewer points off when corrected on site, and a grade from the thresholds in Router settings. Used only when a product administrator switches scoring on. |
| Inspection report | A printable report of one inspection for the facility’s operator: result, score, each violation with its citation, severity, observation and correction status. |
| Operator link | A link, shown once and lasting a set number of days, that lets a facility’s operator read an inspection report without an account, acknowledge receipt and report violations as corrected for staff to verify. |
| Public results | A public page, off until switched on, listing Active facilities with their completed inspections, results, citations and severity. It is not indexed by search engines. |
| Operating dates | The first and last day a seasonal or temporary facility trades. Outside them the facility is not due for inspection. |
Was this page helpful?
Report a problem with this page
Need help with your own setup rather than this page? Raise a support ticket.