Skip to content

Reference

Nuclear Command & Control (NC3) Assurance Check glossary

Terms used in Nuclear Command & Control (NC3) Assurance Check and its documentation.

Applies to Nuclear Command & Control (NC3) Assurance Check as it works today. Moraph updates the platform continuously, and this page is reviewed when it changes.

Last reviewed 1 min readReport a problem

Terms used in Nuclear Command & Control (NC3) Assurance Check and its documentation.

TermMeaning
BaselineThe approved list of software, file hashes and settings a system is expected to have.
CollectorA component in your environment that reads system state with read-only rights and cannot send commands.
VerifiedA check result where the system was fully read and matched its approved baseline.
UnverifiedA result where the system could not be reached or fully read. It is never treated as passing.
DiscrepancyA difference from the baseline, or a failed test, that a person must investigate and close.
Two-person controlThe rule that baseline approvals and discrepancy closures need a second person who did not do the work.
Pre-activity checkAn on-demand check run before an exercise, maintenance window or critical activity.
Communication pathA link between systems whose health is recorded from monitoring feeds and operator tests.
Signed resultA check result digitally signed when recorded so later alteration can be detected.
Evidence packageBaselines, check history, discrepancies and closures assembled for an inspection or authorization review.

Was this page helpful?

Report a problem with this page
What’s the problem?
Quote the step or heading if you can. Don’t include passwords or personal records.
Only if you’d like a reply. We use it for this report and nothing else.

Need help with your own setup rather than this page? Raise a support ticket.