Skip to content

Reference

FedRAMP ATO Accelerator glossary

Terms used in FedRAMP ATO Accelerator and its documentation.

Applies to FedRAMP ATO Accelerator as it works today. Moraph updates the platform continuously, and this page is reviewed when it changes.

Last reviewed 2 min readReport a problem

Terms used in FedRAMP ATO Accelerator and its documentation.

TermMeaning
Authorization boundaryThe set of components that make up the system being authorized, recorded on the System.
Implementation statementThe text explaining how a control is met for this system, written by its owner and approved by the compliance lead.
Inherited controlA control, or part of one, provided by an underlying provider that the system relies on.
POA&MPlan of Action and Milestones, the list of known weaknesses and how and when they will be fixed.
Control parameterAn organization-defined value inside a control, such as how often access is reviewed.
FIPS 199 impact levelThe security categorization (Low, Moderate or High) your team records for the system.
Continuous monitoringOngoing work after authorization; here, the monthly deliverables, scan imports, change reviews and POA&M tracking.
Package versionAn internal snapshot of each control’s stage and a hash of its content and of the boundary, with what changed since the previous version, approved by a second product administrator.
Baseline listThe control IDs of a baseline, pasted by a product administrator, that Package readiness compares each system with.
ComponentOne part of a system proposed for, or confirmed in or outside, its authorization boundary.
ChangeA change to the system with the controls it affects; while open, those controls show as flagged.
Assessor linkA read-only, time-limited link to one system’s approved package for someone without a Moraph account.
Deviation requestA request to your authorizing official to treat a POA&M item differently: a risk adjustment, a false positive or an operational requirement. The Accelerator records its status and dates as your team enters them.
Vendor dependencyA POA&M item whose fix waits on a vendor. The Accelerator reminds the owner to check in with the vendor.
Recurring activitySomething a system owes on a schedule, such as an annual assessment or a contingency plan test, recorded with its due date and how often it repeats.
External serviceA leveraged authorization, interconnected system or external service a system relies on or exchanges data with, recorded with the authorization your team has on record for it.
Known exploited vulnerabilityA vulnerability listed in the catalog of known exploited vulnerabilities your authorizing official follows, recorded on a POA&M item with the due date the catalog gives.
Significant change typeHow your team categorizes a change under your authorizing official’s significant change process: routine recurring, adaptive or transformative.
Security indicatorA Key Security Indicator from the programme’s current list, recorded for a system with how it is met and when it was last validated.

Was this page helpful?

Report a problem with this page
What’s the problem?
Quote the step or heading if you can. Don’t include passwords or personal records.
Only if you’d like a reply. We use it for this report and nothing else.

Need help with your own setup rather than this page? Raise a support ticket.