Reference
FedRAMP ATO Accelerator glossary
Terms used in FedRAMP ATO Accelerator and its documentation.
Applies to FedRAMP ATO Accelerator as it works today. Moraph updates the platform continuously, and this page is reviewed when it changes.
Terms used in FedRAMP ATO Accelerator and its documentation.
| Term | Meaning |
|---|---|
| Authorization boundary | The set of components that make up the system being authorized, recorded on the System. |
| Implementation statement | The text explaining how a control is met for this system, written by its owner and approved by the compliance lead. |
| Inherited control | A control, or part of one, provided by an underlying provider that the system relies on. |
| POA&M | Plan of Action and Milestones, the list of known weaknesses and how and when they will be fixed. |
| Control parameter | An organization-defined value inside a control, such as how often access is reviewed. |
| FIPS 199 impact level | The security categorization (Low, Moderate or High) your team records for the system. |
| Continuous monitoring | Ongoing work after authorization; here, the monthly deliverables, scan imports, change reviews and POA&M tracking. |
| Package version | An internal snapshot of each control’s stage and a hash of its content and of the boundary, with what changed since the previous version, approved by a second product administrator. |
| Baseline list | The control IDs of a baseline, pasted by a product administrator, that Package readiness compares each system with. |
| Component | One part of a system proposed for, or confirmed in or outside, its authorization boundary. |
| Change | A change to the system with the controls it affects; while open, those controls show as flagged. |
| Assessor link | A read-only, time-limited link to one system’s approved package for someone without a Moraph account. |
| Deviation request | A request to your authorizing official to treat a POA&M item differently: a risk adjustment, a false positive or an operational requirement. The Accelerator records its status and dates as your team enters them. |
| Vendor dependency | A POA&M item whose fix waits on a vendor. The Accelerator reminds the owner to check in with the vendor. |
| Recurring activity | Something a system owes on a schedule, such as an annual assessment or a contingency plan test, recorded with its due date and how often it repeats. |
| External service | A leveraged authorization, interconnected system or external service a system relies on or exchanges data with, recorded with the authorization your team has on record for it. |
| Known exploited vulnerability | A vulnerability listed in the catalog of known exploited vulnerabilities your authorizing official follows, recorded on a POA&M item with the due date the catalog gives. |
| Significant change type | How your team categorizes a change under your authorizing official’s significant change process: routine recurring, adaptive or transformative. |
| Security indicator | A Key Security Indicator from the programme’s current list, recorded for a system with how it is met and when it was last validated. |
Was this page helpful?
Report a problem with this page
Need help with your own setup rather than this page? Raise a support ticket.