Skip to content

Setup

Set up FedRAMP ATO Accelerator

The order in which administrators set up FedRAMP ATO Accelerator, and what each step involves.

Applies to FedRAMP ATO Accelerator as it works today. Moraph updates the platform continuously, and this page is reviewed when it changes.

Last reviewed 3 min readReport a problem
On this page
  1. Steps
  2. What the rollout involves
  3. Scoping
  4. Loading your data
  5. Boundary and inheritance
  6. Existing documentation
  7. Workflow and roles
  8. Training and first package

Setting up the product is done by your administrators with Moraph's delivery team, in this order. Each step is confirmed before the next begins.

Steps

  1. Open the workspace. Open the FedRAMP ATO Accelerator in Moraph Apps. The workspace is created with eight record types: System, Control, Evidence, POA&M item, Monthly deliverable, Component, Change and Recurring activity. A workspace created before the newer record types and fields existed gets them from ATO settings (Add them to this workspace). Moraph holds no FedRAMP authorization for this product and isn’t a third-party assessment organization (3PAO).

  2. Set the ATO settings. A product administrator opens ATO settings and sets POA&M target days by severity, how long each type of evidence stays current, reminder lead times, the day monthly deliverables are due, the monthly checklist, review periods for changes and components, the longest an assessor link can work, and whether evidence must be accepted by someone other than the person who added it. The starting values are placeholders, not regulatory values: set them from your authorizing official’s and FedRAMP’s current requirements.

  3. Paste your baseline lists. In ATO settings, paste the control IDs of the Low, Moderate and High baselines your team uses. The FedRAMP baselines and the NIST SP 800-53 catalog text aren’t bundled with Moraph Apps. Package readiness compares each system with the list for its impact level.

  4. Assign people and roles. Ask your organization administrators to add the compliance lead and a second approver as product administrators, and control owners and engineers as users, in the Moraph Portal under People and access. Assessors with a Moraph account get the Viewer role; others can be given an assessor link.

  5. Record the system and its boundary. Add a System with its FIPS 199 impact level, authorization path, boundary, inherited provider, system owner, compliance lead and authorizing official. On Boundary, paste the components (or load them through the Work API), confirm each in or outside the boundary, and approve the boundary.

  6. Add the controls in your baseline. On Package readiness, choose Add the missing controls for the system, or paste control IDs on Controls, or load them through the Work API. Then assign owners in bulk by family on Controls.

  7. Load existing findings. Paste your scanners’ CSV exports on Scan import, enter weaknesses as POA&M items, or load them through the Work API. Scans aren’t run or imported automatically.

  8. Schedule the recurring activities. On Recurring activities, add each activity the system owes on a schedule (for example the annual assessment, a penetration test, contingency and incident response tests, policy reviews) with its due date and how many months until it repeats. Which activities apply and how often comes from your authorizing official’s requirements; none are preloaded.

  9. Record external services and ports. Open External services and add each leveraged authorization, interconnected system and external service the system relies on, with the authorization your team has on record for it, the agreement and what is exchanged. Record the system’s ports, protocols and services on the system, one per line.

  10. Run a first review cycle. Have owners write statements and send them to In review. Approve or return them from Approvals. Check Package readiness, record a first package version and have a second product administrator approve it.

What the rollout involves

Scoping

We agree the system, the target baseline and the likely boundary with your compliance lead and system owner, and identify the tools whose exports will supply components, changes, evidence and findings.

Loading your data

Component lists, scan exports and existing findings are loaded with your engineers by paste or the Work API. We need an engineer who can export from your inventory and scanning tools.

Boundary and inheritance

Loaded components are reviewed with you, the boundary is confirmed, and inherited controls from your infrastructure provider are recorded.

Existing documentation

Where you already have an SSP or policies, its statements are loaded into the controls by CSV import or the Work API and the policies attached as evidence.

Workflow and roles

Control ownership and evidence age thresholds are configured to match how your team works.

Training and first package

Control owners and the compliance lead are trained on their own workflows, and we support the first full review cycle through to an approved package version.

Tip

The general phases of an engagement, from discovery to ongoing operations, are described on Working with Moraph.

The workspace itself (record types, fields, stages and allowed moves) is configured in Settings; see Sign in to read Configuring a product workspace.

Was this page helpful?

Report a problem with this page
What’s the problem?
Quote the step or heading if you can. Don’t include passwords or personal records.
Only if you’d like a reply. We use it for this report and nothing else.

Need help with your own setup rather than this page? Raise a support ticket.