Skip to content

Reference

Tactical Edge Compute Node Manager glossary

Terms used in Tactical Edge Compute Node Manager and its documentation.

Applies to Tactical Edge Compute Node Manager as it works today. Moraph updates the platform continuously, and this page is reviewed when it changes.

Last reviewed 2 min readReport a problem

Terms used in Tactical Edge Compute Node Manager and its documentation.

TermMeaning
NodeA fielded piece of hardware running a Kubernetes cluster or part of one.
BaselineAn approved, versioned set of software components and versions that nodes should run.
Check-inA node's report of its health, installed versions and update status at a point in time, received through the Work API, a CSV file or a staff entry.
Out of dateA node whose last reported versions differ from its assigned baseline, or whose baseline has been superseded.
Not reportingAn active node with no check-in within its check-in window.
Update campaignA record of bringing a set of nodes to an approved baseline, with approval and per-node rollout status.
Pilot groupThe nodes that are the first wave of a campaign before it moves to the next wave or to all targets.
Held rolloutA campaign moved back to Ready because failures reached the threshold in the settings, or because its release bundle was withdrawn.
Release bundleThe record of an update bundle built and signed by the program, with its digest, signing key name and SBOM, released after security review.
Drift exceptionA difference found on a node outside an approved update, decided by a product administrator.
Vulnerability noticeAn announced vulnerability entered by staff, with the affected component and versions, matched against what nodes report.
DeferralA mission owner's decision to postpone approving a campaign until a date, with the reason recorded.
LabelA name=value tag your team puts on a node, such as theatre=north, used to filter the inventory and to choose campaign targets.
WaveOne step of a rollout: the pilot group, then groups of the wave size set on the campaign. A wave opens only when the waves before it are installed and any soak time has passed.
Soak timeHours the nodes of the open waves must stay installed, without a failed health report, before the next wave opens. A figure your program sets on the campaign.
Accepted differenceA setting that differs from the baseline on one node and that a product administrator accepted until a date; it doesn't count as drift while the node keeps reporting the accepted value.

Was this page helpful?

Report a problem with this page
What’s the problem?
Quote the step or heading if you can. Don’t include passwords or personal records.
Only if you’d like a reply. We use it for this report and nothing else.

Need help with your own setup rather than this page? Raise a support ticket.