Skip to content

Setup

Set up Tactical Edge Compute Node Manager

The order in which administrators set up Tactical Edge Compute Node Manager, and what each step involves.

Applies to Tactical Edge Compute Node Manager as it works today. Moraph updates the platform continuously, and this page is reviewed when it changes.

Last reviewed 3 min readReport a problem
On this page
  1. Steps
  2. What the rollout involves
  3. Fleet discovery
  4. Baseline definition
  5. Signing key records
  6. Link and transfer profiles
  7. Pilot platforms
  8. Training and handover

Setting up the product is done by your administrators with Moraph's delivery team, in this order. Each step is confirmed before the next begins.

Steps

  1. Open the workspace. Open the product in Moraph Apps. The workspace starts with the Edge node, Software baseline, Update campaign, Check-in batch, Release bundle, Drift exception and Vulnerability notice record types, and adds Node inventory, Out of date or silent, Baselines and versions, Release bundles, Update campaigns, Pending approvals, Drift and compliance, Exposure search, Check-ins, Fleet reports, Evidence and Node settings to the navigation. A workspace created before these were added gets them from Node settings, Add them to this workspace.

  2. Confirm the node settings. A product administrator opens Node settings and sets the check-in window (and any window per platform type), the failure threshold for holding a rollout, the check-ins kept per node, the approval reminder, drift and stale-version periods, the number of failed attempts before a node needs a technician (off until you set it), and the rules and automation switches. The values start as placeholders until saved.

  3. Ask your organization administrators to grant roles. In the Moraph Portal under People and access, give fleet operators, release managers, field technicians and mission owners the User role, security officers who approve baselines, release bundles and drift decisions the Product administrator role, and inspectors the Viewer role.

  4. Enter your baselines. Add each approved software baseline with its components as name=version lines and, where you check them, its configuration settings as name=value lines. Move it to In review and have a product administrator who neither created nor changed it approve it on the record.

  5. Load the node inventory. Import nodes by pasting them on the Node inventory, up to 100 at a time, or add each one, with its node ID, platform, platform type, unit, rollout group, baseline, link type, bandwidth, mission owner and your own labels (name=value, such as theatre=north). Then move each to Active; an Active node needs an approved baseline while that rule is on. Use Change many nodes on the inventory to set the rollout group or labels of up to 100 nodes in one step.

  6. Connect your agent or delivery system. Create a Work API key with records:write and have your node agent, delivery system or a forwarding job send Check-in batch records of up to 7,999 characters each. Moraph doesn't connect to nodes itself and pushes nothing to them.

  7. Check the first check-ins. Load a sample of check-ins and confirm each node's installed versions, settings, last check-in and baseline status on the Node inventory, and that any drift found appears under Drift and compliance.

What the rollout involves

Fleet discovery

We work with your program to list fielded platforms, nodes, clusters and their links, and load them into the inventory. We need hardware and configuration records and a contact from each platform team.

Baseline definition

Approved cluster configurations, including applicable STIG settings, are captured as versioned baselines and reviewed with your security officer.

Signing key records

The names of the keys your program signs with are recorded for security review; keys and trust anchors stay under your program's key management, and the app never holds them.

Link types, planning bandwidths, check-in windows by platform type and your approved physical transfer process are agreed and entered for your fleet.

Pilot platforms

Check-ins from your own agent or delivery system are connected through the Work API for a small set of platforms, and a test campaign is tracked end to end before the wider fleet is enrolled.

Training and handover

Fleet operators, release managers, mission owners and field technicians are trained on their own workflows, with runbooks for recovery and physical transfer.

Tip

The general phases of an engagement, from discovery to ongoing operations, are described on Working with Moraph.

The workspace itself (record types, fields, stages and allowed moves) is configured in Settings; see Sign in to read Configuring a product workspace.

Was this page helpful?

Report a problem with this page
What’s the problem?
Quote the step or heading if you can. Don’t include passwords or personal records.
Only if you’d like a reply. We use it for this report and nothing else.

Need help with your own setup rather than this page? Raise a support ticket.